EQUINOX 3240+1 in South CAROLINA
Construction

Like many Enertia® projects, this build in South Carolina begins with a visit by the Enertia® team to the site, which is truly inspiring.
Stacks Image 3267
Stacks Image 18083
Stacks Image 18085
What's going on is the planning of an Enertia® Equinox 3240+1 to blend in right here in this beautiful rural spot.
While the customer and builders talk, the cows and horses wonder what is happening.
Stacks Image 18087
Stacks Image 3281
Stacks Image 3287
Stacks Image 18091
Stacks Image 3292
Stacks Image 18089
While the Enertia® kit is being cut in the factory, the site work has been going on, the foundation forms have been set and poured, the plumbing has been stubbed in, and now the lower level floor is about to be poured. What a nice clean foundation it is!
Stacks Image 3298
Stacks Image 3301
The lower level framing is under way. Frame walls running North-South can be used to divide the lower level, but frame walls can not run East-West lest they interfere with proper airflow in the Enertia® air-loop. The short East-West concrete wall is structural and will support the Sunspace timber wall above.
Stacks Image 18101
Stacks Image 18104
The lower South wall has been built. This homeowner purchased the "lower south option" which provides matching timbers for the South foundation wall. Other options are owner-provided framing/siding, or stone-faced concrete.
Stacks Image 18162
Stacks Image 18167
The lower level floor joists are hung with metal joist hangers of the appropriate size.
Stacks Image 18110
Stacks Image 18113
Here the outer band, floor joists and subfloor have been built. On the North you can see cutouts for the double North Wall air-flow loop, and on the South you can see a barrier around the stairwell cutout.
Stacks Image 18119
Stacks Image 18125
Stacks Image 18122
The heavy timber doors and windows are set in place and braced off. These then become anchor points to keep the walls true and plumb as they go up. In the image directly above notice the double window frames on the North, with space for the North wall airflow loop between the inner and outer North walls.
Stacks Image 18140
Daily the walls rise higher as additional "courses" of timbers are set in place. The door and window frames continue to serve as reference points to keep everything true and straight.
Stacks Image 18135
Stacks Image 18132
Stacks Image 18143
Each day brings more progress. Above is another South East exterior view. On the upper right is the North East exterior view. On the lower right is the South West exterior.
Stacks Image 18148
Stacks Image 18150
Stacks Image 18173
Above is a view through the large sunspace doorway take standing in the sunspace and looking into what will be the master bedroom. The interior is beginning to take shape.
Stacks Image 18178
Stacks Image 18180
Stacks Image 18185

This is a view of the North side of the home. The timbers have almost reached the window cross-over.

Stacks Image 18221
Stacks Image 18226
Stacks Image 18216
Stacks Image 18223
Now the timbers have crossed over the door and window openings, except for the South wall. The views above are Northwest (top, left), Northeast (top, right), South (lower, left) and East (lower, right).
Stacks Image 18190
Stacks Image 18195
The Girders that will support the floor system for the upper level have been set into the prepared pockets. in the inner North and South walls.
Stacks Image 18231
Hurricane Michael came through the area so the builder covered the waiting timbers and the top of the wall with plastic so the crew could start working as soon as the storm passes.
Stacks Image 18248
Stacks Image 18243

The floor system for the second floor has been set. The joists cross over the girders giving extra height in the first floor area.

Stacks Image 18260
Stacks Image 18263

The East (left) and West (right) walls are rising higher.

Stacks Image 18266

The floor beams are visible through the sunspace sliding glass door openings.

Stacks Image 18271
Stacks Image 18274
The North and South knee walls have reached their full height. Notice the rafter pockets. Now the East and West gables are being set. The slope cuts were made in the factory, so these walls go up quickly.
Stacks Image 18280
Stacks Image 18286
Stacks Image 18283
The gables really give the house shape when viewed from the outside. The portions of the foundation that will be visible (not hidden by porches) will have stone facing.
Stacks Image 18292
Stacks Image 18315
The floor beams are visible through the sunspace sliding glass door openings (left). The view of the pond from the sunspace will be beautiful.
Stacks Image 18297
Stacks Image 18299
Stacks Image 18302
Stacks Image 18307

The gables continue to rise. This part of the kit construction moves along fairly quickly.

Stacks Image 18321
Stacks Image 18323
Stacks Image 18326
Stacks Image 18328

The gables are almost complete. Enertia® gable walls are solid wood all the way to the very top.

Stacks Image 18336
Stacks Image 18346
Stacks Image 18339
Stacks Image 18350

The rafters are set with the Lull crane (lower left).

Stacks Image 18356
Stacks Image 18361
The first SIPS (Structural Insulated Panel System) panels are set on the North and South. Again, the Lull is a real time and energy saver.
Stacks Image 18369
The roof panels are in place. The finished roofing will be applied to the top of the panels.
Stacks Image 18375
Stacks Image 18377
Stacks Image 18382
Stacks Image 18384
Inside, the second floor is taking shape. The inner ceiling will be nailed to the lower edge of the rafters and collar ties to form part of the air loop and the attic.
Stacks Image 18388
Stacks Image 18394
Stacks Image 18399

The Anderson windows and have arrived and are being installed. Skylights line up with the upper sunspace windows.

Stacks Image 18408
Stacks Image 18405
The doors are not in place yet. With plywood closing those openings temporarily, this Enertia® home has started to retain the Sun's heat, giving a preview of it's future performance. Although winter is coming, working on the interior will be a pleasant experience.
Stacks Image 18414
Stacks Image 18417
The Enertia team visited the job site at New Years. The approach is from the North. The windows are installed, but the metal roof is not in place yet.
Stacks Image 18423
Stacks Image 18426
The timber-framing for the West Porch is up. This porch will eventually be screened and has gorgeous views of the woods to the North and West, and the pond to the South.
Stacks Image 18432
Stacks Image 18435
The Sunspace (left) is heating the home now that the windows have been installed. Above on the right is the double North wall with a window in each wall bringing in plenty of sunlight and more views of the woods.
Stacks Image 18441
These are some construction details on the second floor. Rough-in wiring is in place before the ceiling boards are installed. Reflective paint that will increase the R-value of the attic area has been sprayed and will not be hidden within the attic. In the photos on the right you can see the edge of the very thick roof insulation "sandwich" in the bathroom dormer framing.
Stacks Image 18444
Stacks Image 18449
Stacks Image 18454
The pond is a great reflecting surface for the South side.
Stacks Image 18459
Stacks Image 18465
Stacks Image 18473
Stacks Image 18475
Stacks Image 18477
At our next visit the metal roof was on. The porch and Sunspace are progressing, while the plumbers are working in the inner living space!